I would try to remove all views with removeView(view)
and add them with addView(childView, index)
in that order you like.
More Related Contents:
- Android layout with one side round [closed]
- How to make layout with rounded corners..?
- Set the absolute position of a view
- Android Layout Weight
- How can I dynamically set the position of view in Android?
- When Can I First Measure a View?
- how to read value from string.xml in android?
- How to size an Android view based on its parent’s dimensions
- Set the layout weight of a TextView programmatically
- How to make an Android SlidingDrawer slide out from the left?
- Why this line xmlns:android=”http://schemas.android.com/apk/res/android” must be the first in the layout xml file?
- How to show android checkbox at right side?
- How to force an entire layout View refresh?
- Android: can height of SlidingDrawer be set with wrap_content?
- How do you setLayoutParams() for an ImageView?
- Android: Custom Title Bar
- Android: Last line of textview cut off
- “You need to use a Theme.AppCompat theme (or descendant) with the design library” error
- Change the Right Margin of a View Programmatically?
- How do you make layouts for several Android screen sizes?
- Not enough space to show ad (AdMob)
- Remove line break in TabLayout
- What is setContentView(R.layout.main)?
- EditText, inputType values (XML)
- How to create a view that is bigger than the screen?
- How to expand a layout height with animation?
- How to create fixed footer in android layout?
- Grid Layout support in android API 10
- Android ListView that does not scroll?
- Custom PopupMenu (layout)